{"product_id":"stationary-tube-lifter","title":"Stationary Tube Lifter | Vacuum-Workstation","description":"\u003cdiv class=\"row\"\u003e\n\u003cdiv id=\"produkt-tabs\" class=\"col-sm-12\"\u003e\n\u003cdiv class=\"tab-content\"\u003e\n\u003ch2 data-start=\"160\" data-end=\"183\"\u003eVacuum-Workstation\u003c\/h2\u003e\n\u003cp data-start=\"184\" data-end=\"260\"\u003e\u003cstrong data-start=\"184\" data-end=\"260\"\u003eEfficient, Ergonomic Lifting for Concrete Plants \u0026amp; Building Supply Yards\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp data-start=\"262\" data-end=\"539\"\u003eThe \u003cstrong data-start=\"266\" data-end=\"288\"\u003eVacuum-Workstation\u003c\/strong\u003e is a high-performance material handling solution built for concrete manufacturers and hardscape suppliers. Designed to \u003cstrong data-start=\"408\" data-end=\"460\"\u003elift, move, and palletize up to 250 kg (550 lbs)\u003c\/strong\u003e with ease, it boosts productivity while drastically reducing operator fatigue.\u003c\/p\u003e\n\u003cp data-start=\"262\" data-end=\"539\"\u003eAvailable in \u003cstrong\u003e5 different configurations\u003c\/strong\u003e, see below.\u003c\/p\u003e\n\u003chr data-start=\"541\" data-end=\"544\"\u003e\n\u003ch3 data-start=\"546\" data-end=\"565\"\u003eKey Features:\u003c\/h3\u003e\n\u003cul data-start=\"566\" data-end=\"1079\"\u003e\n\u003cli data-start=\"566\" data-end=\"657\"\u003e\n\u003cp data-start=\"568\" data-end=\"657\"\u003e\u003cstrong data-start=\"568\" data-end=\"599\"\u003eLift Up to 250 kg (550 lbs)\u003c\/strong\u003e – Ideal for concrete pavers, wet cast, blocks, and more\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"658\" data-end=\"755\"\u003e\n\u003cp data-start=\"660\" data-end=\"755\"\u003e\u003cstrong data-start=\"660\" data-end=\"687\"\u003eFast \u0026amp; Precise Handling\u003c\/strong\u003e – Speed up palletizing and order picking with millimeter accuracy\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"756\" data-end=\"856\"\u003e\n\u003cp data-start=\"758\" data-end=\"856\"\u003e\u003cstrong data-start=\"758\" data-end=\"778\"\u003eErgonomic Design\u003c\/strong\u003e – Near weightless operation reduces strain on the back, neck, and shoulders\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"857\" data-end=\"965\"\u003e\n\u003cp data-start=\"859\" data-end=\"965\"\u003e\u003cstrong data-start=\"859\" data-end=\"882\"\u003eDust-Resistant Tech\u003c\/strong\u003e – Industrial-grade vacuum pump and filter perform reliably in dusty environments\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"966\" data-end=\"1079\"\u003e\n\u003cp data-start=\"968\" data-end=\"1079\"\u003e\u003cstrong data-start=\"968\" data-end=\"993\"\u003ePerfect for Daily Use\u003c\/strong\u003e – Built for sorting, stacking, and shipping in busy supply yards and production lines\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1081\" data-end=\"1084\"\u003e\n\u003ch3 data-start=\"1086\" data-end=\"1100\"\u003eBuilt for:\u003c\/h3\u003e\n\u003cul data-start=\"1101\" data-end=\"1226\"\u003e\n\u003cli data-start=\"1101\" data-end=\"1131\"\u003e\n\u003cp data-start=\"1103\" data-end=\"1131\"\u003eConcrete production plants\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1132\" data-end=\"1164\"\u003e\n\u003cp data-start=\"1134\" data-end=\"1164\"\u003eHardscape distribution yards\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1165\" data-end=\"1196\"\u003e\n\u003cp data-start=\"1167\" data-end=\"1196\"\u003eStone and block palletizing\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1197\" data-end=\"1226\"\u003e\n\u003cp data-start=\"1199\" data-end=\"1226\"\u003eOrder picking and staging\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cstrong data-start=\"1233\" data-end=\"1296\"\u003e\u003c\/strong\u003e\u003chr data-start=\"1228\" data-end=\"1231\"\u003e\n\u003ch3 data-start=\"265\" data-end=\"314\"\u003eCrane Mounting Options for Vacuum-Workstation\u003c\/h3\u003e\n\u003cp data-start=\"316\" data-end=\"599\"\u003eTo match the needs of different facilities and material handling workflows, the Vacuum-Workstation is available in \u003cstrong data-start=\"431\" data-end=\"470\"\u003efive versatile crane configurations\u003c\/strong\u003e. Whether you're optimizing for flexibility, space constraints, or permanent placement, there's a solution to fit your operation.\u003c\/p\u003e\n\u003chr data-start=\"601\" data-end=\"604\"\u003e\n\u003ch4 data-start=\"606\" data-end=\"667\"\u003e\u003cstrong data-start=\"611\" data-end=\"667\"\u003e1. Mobile Pillar Crane with Articulated Foldable Arm\u003c\/strong\u003e\u003c\/h4\u003e\n\u003cul data-start=\"668\" data-end=\"964\"\u003e\n\u003cli data-start=\"668\" data-end=\"736\"\u003e\n\u003cp data-start=\"670\" data-end=\"736\"\u003e\u003cstrong data-start=\"672\" data-end=\"691\"\u003eArticulated arm\u003c\/strong\u003e design for flexibility and compact storage\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"737\" data-end=\"810\"\u003e\n\u003cp data-start=\"739\" data-end=\"810\"\u003e\u003cstrong data-start=\"741\" data-end=\"753\"\u003eFoldable\u003c\/strong\u003e for tight work zones or where space-saving is critical\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"811\" data-end=\"886\"\u003e\n\u003cp data-start=\"813\" data-end=\"886\"\u003e\u003cstrong data-start=\"815\" data-end=\"825\"\u003eMobile\u003c\/strong\u003e base on a \u003cstrong data-start=\"836\" data-end=\"859\"\u003econcrete foundation\u003c\/strong\u003e for relocation if needed\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"887\" data-end=\"964\"\u003e\n\u003cp data-start=\"889\" data-end=\"964\"\u003eIdeal for yards that need flexibility and maneuverability in their layout\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"966\" data-end=\"969\"\u003e\n\u003ch4 data-start=\"971\" data-end=\"1019\"\u003e\u003cstrong data-start=\"976\" data-end=\"1019\"\u003e2. Mobile Pillar Mounted Jib Crane with Trolley Arm\u003c\/strong\u003e\u003c\/h4\u003e\n\u003cul data-start=\"1020\" data-end=\"1221\"\u003e\n\u003cli data-start=\"1020\" data-end=\"1091\"\u003e\n\u003cp data-start=\"1022\" data-end=\"1091\"\u003eStraight \u003cstrong data-start=\"1033\" data-end=\"1049\"\u003etrolley beam\u003c\/strong\u003e allows for long, smooth linear movement\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1092\" data-end=\"1141\"\u003e\n\u003cp data-start=\"1094\" data-end=\"1141\"\u003e\u003cstrong data-start=\"1096\" data-end=\"1114\"\u003eMobile version\u003c\/strong\u003e on a concrete foundation\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1142\" data-end=\"1221\"\u003e\n\u003cp data-start=\"1144\" data-end=\"1221\"\u003ePerfect for environments where a straight arm offers a better working range\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1223\" data-end=\"1226\"\u003e\n\u003ch4 data-start=\"1228\" data-end=\"1289\"\u003e\u003cstrong data-start=\"1233\" data-end=\"1289\"\u003e3. Fixed Floor \u0026amp; Pillar Mounted Jib Crane with Trolley Arm\u003c\/strong\u003e\u003c\/h4\u003e\n\u003cul data-start=\"1290\" data-end=\"1454\"\u003e\n\u003cli data-start=\"1290\" data-end=\"1330\"\u003e\n\u003cp data-start=\"1292\" data-end=\"1330\"\u003ePermanent \u003cstrong data-start=\"1304\" data-end=\"1321\"\u003efloor-mounted\u003c\/strong\u003e pillar\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1331\" data-end=\"1396\"\u003e\n\u003cp data-start=\"1333\" data-end=\"1396\"\u003eStraight \u003cstrong data-start=\"1344\" data-end=\"1360\"\u003etrolley rail\u003c\/strong\u003e for direct, side-to-side coverage\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1397\" data-end=\"1454\"\u003e\n\u003cp data-start=\"1399\" data-end=\"1454\"\u003eExcellent for \u003cstrong data-start=\"1413\" data-end=\"1452\"\u003ehigh-frequency palletizing stations\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1456\" data-end=\"1459\"\u003e\n\u003ch4 data-start=\"1461\" data-end=\"1535\"\u003e\n\u003cstrong data-start=\"1466\" data-end=\"1535\"\u003e4. Fixed Floor \u0026amp; Pillar Mounted Crane with Articulated \u003c\/strong\u003e\u003cstrong data-start=\"1466\" data-end=\"1535\"\u003eStraight \u003c\/strong\u003e\u003cstrong data-start=\"1466\" data-end=\"1535\"\u003eArm\u003c\/strong\u003e\n\u003c\/h4\u003e\n\u003cul data-start=\"1536\" data-end=\"1715\"\u003e\n\u003cli data-start=\"1536\" data-end=\"1605\"\u003e\n\u003cp data-start=\"1538\" data-end=\"1605\"\u003e\u003cstrong data-start=\"1540\" data-end=\"1568\"\u003eArticulated straight arm\u003c\/strong\u003e for a mix of reach and horizontal flexibility\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1606\" data-end=\"1645\"\u003e\n\u003cp data-start=\"1608\" data-end=\"1645\"\u003eMounted directly to the \u003cstrong data-start=\"1634\" data-end=\"1643\"\u003efloor\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1646\" data-end=\"1715\"\u003e\n\u003cp data-start=\"1648\" data-end=\"1715\"\u003eGreat for constrained spaces that still require reach flexibility\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1717\" data-end=\"1720\"\u003e\n\u003ch4 data-start=\"1722\" data-end=\"1782\"\u003e\u003cstrong data-start=\"1727\" data-end=\"1782\"\u003e5. Wall-Mounted Crane with Articulated Straight Arm\u003c\/strong\u003e\u003c\/h4\u003e\n\u003cul data-start=\"1783\" data-end=\"1990\"\u003e\n\u003cli data-start=\"1783\" data-end=\"1843\"\u003e\n\u003cp data-start=\"1785\" data-end=\"1843\"\u003eDesigned for \u003cstrong data-start=\"1800\" data-end=\"1821\"\u003ewall installation\u003c\/strong\u003e to save floor space\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1844\" data-end=\"1901\"\u003e\n\u003cp data-start=\"1846\" data-end=\"1901\"\u003e\u003cstrong data-start=\"1848\" data-end=\"1867\"\u003eArticulated arm\u003c\/strong\u003e offers smooth, precise horizontal movement\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1902\" data-end=\"1990\"\u003e\n\u003cp data-start=\"1904\" data-end=\"1990\"\u003eBest for shops or plants with \u003cstrong data-start=\"1934\" data-end=\"1957\"\u003elimited floor space\u003c\/strong\u003e but vertical structure support\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1992\" data-end=\"1995\"\u003e\n\u003cp data-start=\"1997\" data-end=\"2183\"\u003eEach system is engineered to handle loads up to \u003cstrong data-start=\"2045\" data-end=\"2065\"\u003e250 kg (550 lbs)\u003c\/strong\u003e with ergonomic ease and can be paired with Optimas vacuum lifting technology for efficient, dust-resistant operation.\u003c\/p\u003e\n\u003cp data-start=\"2185\" data-end=\"2274\"\u003eNeed help choosing the best setup? Call \u003cstrong data-start=\"2228\" data-end=\"2244\"\u003e860-870-8665\u003c\/strong\u003e for tailored recommendations.\u003c\/p\u003e\n\u003cp data-start=\"1424\" data-end=\"1474\" data-is-last-node=\"\" data-is-only-node=\"\"\u003e\u003ciframe width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/mQHTvpEft6Q?si=sWwrgqhrooUlhFbl\" title=\"YouTube video player\"\u003e\u003c\/iframe\u003e\u003c\/p\u003e\n\u003cdiv class=\"style-scope ytd-watch-metadata\" id=\"top-row\"\u003e\n\u003cdiv class=\"item style-scope ytd-watch-metadata\" id=\"owner\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cp\u003e\u003cscript type=\"application\/ld+json\"\u003e\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"VideoObject\",\n  \"name\": \"New Mecalac Arrival\",\n  \"description\": \"A Mecalac with the Optimas Paver Laying Multi6 Head attachment - Lay Entire Layers of Pavers quickly and efficiently.\",\n  \"thumbnailUrl\": \"https:\/\/img.youtube.com\/vi\/I5nEp4mV-ug\/sddefault.jpg\",\n  \"uploadDate\": \"2020-02-05\",\n  \"duration\": \"PT2M7S\",\n  \"contentUrl\": \"https:\/\/youtu.be\/I5nEp4mV-ug\",\n  \"potentialAction\": {\n    \"@type\": \"SeekToAction\",\n    \"target\": \"https:\/\/pavetool.com\/products\/optimas-paver-clamp-multi-6-laying-machine={seek_to_second_number}\",\n    \"startOffset-input\": \"required name=seek_to_second_number\"\n  }\n}\n\u003c\/script\u003e \u003cscript type=\"application\/ld+json\"\u003e\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"VideoObject\",\n  \"name\": \"Adjusting Multi6 Paver Clamp Part 1 - Gripping Width\",\n  \"description\": \"Learn how to correctly position the grip of a Multi6 Paver Clamp.\",\n  \"thumbnailUrl\": \"https:\/\/img.youtube.com\/vi\/G2SId-lHQnc\/sddefault.jpg\",\n  \"uploadDate\": \"2022-07-25\",\n  \"duration\": \"PT2M56S\",\n  \"contentUrl\": \"https:\/\/youtu.be\/G2SId-lHQnc\",\n  \"potentialAction\": {\n    \"@type\": \"SeekToAction\",\n    \"target\": \"https:\/\/pavetool.com\/products\/optimas-paver-clamp-multi-6-laying-machine={seek_to_second_number}\",\n    \"startOffset-input\": \"required name=seek_to_second_number\"\n  }\n}\n\u003c\/script\u003e \u003cscript type=\"application\/ld+json\"\u003e\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"VideoObject\",\n  \"name\": \"Adjusting Multi6 Paver Clamp Part 2 - Height adjustment\",\n  \"description\": \"Learn how to correctly adjust the height of a Multi6 Paver Clamp.\",\n  \"thumbnailUrl\": \"\",\n  \"uploadDate\": \"2022-07-25\",\n  \"duration\": \"PT3M47S\",\n  \"contentUrl\": \"https:\/\/youtu.be\/b-t2uZET2Fs\",\n  \"potentialAction\": {\n    \"@type\": \"SeekToAction\",\n    \"target\": \"https:\/\/pavetool.com\/products\/optimas-paver-clamp-multi-6-laying-machine={seek_to_second_number}\",\n    \"startOffset-input\": \"required name=seek_to_second_number\"\n  }\n}\n\u003c\/script\u003e \u003cscript type=\"application\/ld+json\"\u003e\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"VideoObject\",\n  \"name\": \"Labor Shortage Combating with Equipment\",\n  \"description\": \"With the Multi6 3K Excavator head attachment Hardscapers and Landscapers can lay paver products with an excavator. Here we are showing the efficiency of laying Blu 60 with and excavator and suction equipment. A two man crew to lay pavers and is more efficient and cost-effective than 4 laborer's!\",\n  \"thumbnailUrl\": \"https:\/\/img.youtube.com\/vi\/P2XIAJypQ4U\/sddefault.jpg\",\n  \"uploadDate\": \"2020-05-07\",\n  \"duration\": \"PT5M15S\",\n  \"contentUrl\": \"https:\/\/youtu.be\/P2XIAJypQ4U\",\n  \"potentialAction\": {\n    \"@type\": \"SeekToAction\",\n    \"target\": \"https:\/\/pavetool.com\/products\/optimas-paver-clamp-multi-6-laying-machine={seek_to_second_number}\",\n    \"startOffset-input\": \"required name=seek_to_second_number\"\n  }\n}\n\u003c\/script\u003e\u003c\/p\u003e","brand":"Pave Tool Innovators","offers":[{"title":"Default Title","offer_id":67754769481961,"sku":null,"price":18289.74,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0241\/6843\/files\/vacuum-workstation-web-1.jpg?v=1751907972","url":"https:\/\/pavetool.com\/products\/stationary-tube-lifter","provider":"Pave Tool Innovators","version":"1.0","type":"link"}